Yay! I finally realised there was a second rabbit hole – the one Alex uses to get in. Trust me to try and go down the wrong hole! The hole was partially blocked by some wood left in the loft, but after ten minutes of wriggling around I was finally in. Lots of progress. Can see the bathroom and area they are sectioning off for the boiler – I’m not sure why they dont include a tall thin door for access to it – currently have to crawl through the short wide access to get into the boiler area.
Click below for slideshow